Some checks failed
Periodic Merges (6h) / master → staging-nixos (push) Failing after 12m50s
Periodic Merges (6h) / master → staging-next (push) Failing after 12m54s
Periodic Merges (24h) / merge-base(master,staging) → haskell-updates (push) Failing after 11m54s
Periodic Merges (6h) / staging-next → staging (push) Failing after 12m13s
Periodic Merges (24h) / staging-next-25.05 → staging-25.05 (push) Failing after 13m24s
Periodic Merges (24h) / release-25.05 → staging-next-25.05 (push) Failing after 14m28s
6 lines
394 B
Markdown
6 lines
394 B
Markdown
# ninja {#ninja}
|
|
|
|
Overrides the build, install, and check phase to run ninja instead of make. You can disable this behavior with `dontUseNinjaBuild`, `dontUseNinjaInstall`, and `dontUseNinjaCheck`, respectively. Parallel building is enabled by default in Ninja.
|
|
|
|
Note that if the [Meson setup hook](#meson) is also active, Ninja's install and check phases will be disabled in favor of Meson's.
|